Zhaoqing City Dinghu District Chuangye Road Road Construction Engineering Investigation and Design

The bidding project of the road construction project of Chuangye Road, Dinghu District, Zhaoqing City, was approved by the Dinghu District Development and Reform Bureau of Zhaoqing City. The bidder was Dinghu District, Zhaoqing City, and Hefa Construction Investment Co., Ltd. The project required funding sources for finance and financing. The project has already met the conditions for tendering. The project is now undergoing public bidding for the road construction engineering survey and design of Chuangye Road, Dinghu District, Zhaoqing City. In this tender, the qualification of bid applicants is reviewed, and after qualification, the appropriate bid applicants are selected to participate in the bid.

II. Project overview and scope of tender
1. The construction site for this bidding project: Dinghu District, Zhaoqing City.
2. Project Scale: The total length of this road route is 3.95km, the planned road width is 68m, the design speed is 60km/h, the motorway lanes are two lanes and eight lanes; the new bridge is one, and the bridge length is 803m. The highest bidding price for survey fees is 255,0400.00 yuan (excluding the supplementary survey fee for the construction phase); the maximum bidding price for the design fee is 11,231,684.82 yuan. The construction content includes road projects, bridges and culverts, water supply and drainage projects, lighting projects, greening projects, and transportation facilities.
3. This announcement is divided into a total of 1 bid section
Lot No. Tender Name Tender Area Tender Control Price (yuan) Duration (days)
E4412000001000097001001 Road construction engineering investigation and design engineering investigation of Chuangye Road, Dinghu District, Zhaoqing City (reconnaissance of geotechnical engineering survey, topographic maps, etc.), supplementary survey of construction stage (if necessary), scheme design (including modification), preliminary design, construction drawing design , related to the construction and construction of tendering and cooperation, on-site guidance and supervision, with the construction and completion acceptance..82 75
III. Qualification requirements of bidders: Bidders who have not registered on the China Pickup Information Network http://
1. Qualification level and scope:
2. Project leader qualification categories and levels:
3. This tender accepts consortium bids. The bid for the consortium shall meet the following requirements: a consortium bid shall be formed by a member unit that meets the design qualification requirements and another member unit that meets the survey qualification requirements. The consortium member shall not exceed 2 and the design party shall be the main party; All parties shall sign a consortium agreement to clarify the rights and obligations of the parties to the consortium, and specify that the consortium’s legal representatives shall be responsible for the preparation of tender documents and contract negotiation activities for the bid invitation project, and shall submit and receive on behalf of the consortium. Relevant materials, information and instructions deal with all related matters and are responsible for organizing, organizing and coordinating the implementation phase of the contract; parties to the Consortium must not individually participate in or participate in other consortiums in this tendering project. Tender (consortium composition shall be determined at the time of registration, and shall not be changed after registration); independent legal entity units or consortium bidders shall be registered with the information registration company in Zhaoqing City, and the person in charge of the unit shall be the same person or different units with controlling and management relationships. Cannot participate in the same tender project bidding.
4. Other requirements:
(1) Qualification level and scope: 1 Survey qualification requirements: Grade A comprehensive qualification for engineering survey; Grade B or above (including Grade B) and Engineering survey (geotechnical engineering survey) Grade A or above for engineering survey (engineering survey) (Grade A) Qualification; 2 Design Qualification Requirements: Engineering Design Integrated Grade A Qualification; or Engineering Design Municipal Industry (Road Engineering, Bridge Engineering, Drainage Engineering) Professional Grade A or above (including Class A), Engineering Design Municipal Industry (Water Supply Engineering) professional grade C (including C) qualifications.
(2) Qualification category and level of project leader: 1 The person in charge of the survey project must have registered civil engineer (geotechnical) qualifications; 2 The person in charge of the design project must have senior professional engineer of road and bridge or above.
Fourth, the tender
1. The online registration time is December 12 from 00:00 to December 20, 2016 23:59:59

Agriculture Analysis Drone is a small Agriculture Drone, It use for check and analysis the crop growing status, Help farmer make smarter decisions for better way to work. Using the NDVI map analyze and compare the crap data, and compare the current mpa with past versions to track the evolution of crops. Idenifying probelm areas.

Agriculture Analysis Drone

Agricultural Drones,Agriculture Drone Jobs,Agriculture Drone Sprayer,Benefits Of Drones In Agriculture

shenzhen GC Electronics Co.,Ltd. , https://www.jmrdrone.com

没有评论:

发表评论