2020年4月1日星期三

About the road engineering of Hengsan Road (Xidong Road to Zihu Road) and Zihu Road (from Hengsan Road to the south of Nantouyong) to the road project supervision (second tender)

The road project of Hengsan Road (Xidong Road to Zihu Avenue) and Zihu Avenue (from Hengsan Road to Nantouyong) have been transferred from Zen City Development Planning and Statistics Bureau to Foshan City [2016] No. 49 and No. 50 were approved for construction. The tenderee (project owner) was Foshan Chancheng Water Town New City Development and Construction Co., Ltd. The construction funds were from financial funds. The project has already met the conditions for bidding. The second public bidding for the project supervision service for the project is now underway.
2. Project overview and scope of tender
2.1 Construction Site: Nanzhuang Town, Chancheng District, Foshan City
2.2 Scale of Project Construction: The bidding project includes the road engineering of Hengsan Road (Xidong Road to Zihu Road) and Zihu Road (Yangsan Road to the south of Nantouyong). The project is located in Nanzhuang Town, Chancheng District. The main construction content of the project includes: road works, water supply and drainage (rain, sewage) works, greening projects, bridges and culverts, lighting projects, traffic projects, etc. The estimated total investment of the project is about 64.63 million yuan, and the Jian'an fee is about 50.76 million yuan. The benchmark price for the bidding supervision fee is 1,336,768.50 yuan.
1 Hengsan Road (Xidong Road to Zihu Avenue) The total length of the road project is about 340 meters. The width of the subgrade is about 36 meters. There is a total of 1 bridge across the river. The road grade is the urban main road, using two-way six lanes, the design speed is 40km/h, the starting point is Zidong Road, and the end is Zihu Avenue, which is east-west direction. The cross-river bridge is AK0+041.703 with a standard span of 13 meters. The estimated total construction cost of the project is approximately RMB 40,200, and the Jian’an fee is approximately RMB 31.31 million (including a construction fee of RMB 22.73 million for the road section and RMB 8.58 million for the bridge construction fee). .
2 Zihu Avenue (Yangsan Road to the south of Nantouyong) The total length of the road project is about 360 meters, the width of the roadbed is 25 meters, and the road grade is urban slip roads. The two-way four-lane road is adopted and the design speed is 40km/h. From the south of Hengsan Road, north to the south of Nantouyong, it intersects with the Hengsan Road along the north and north-south direction. The estimated total construction cost of the project is approximately 24.61 million yuan, of which the construction and installation fee is 19.45 million yuan.
2.3 Supervision service period: The project is expected to have a total supervision service period of 42 months. The specific requirements are as follows:
From the beginning of the construction preparation period to the end of the defect liability period and the final issuance of the certificate of termination of defect liability, the supervision service period is expected to total 42 months [In which, the construction period (including supervision during the construction preparation period) is approximately 18 months, and the completion acceptance is Defects liability period supervision is 24 months.]. The actual start time is based on the start-up order issued by the tenderer. The completion time is confirmed by the supervisor and the tenderer.
2.4 The scope of the tender for this tender is construction supervision services for the road engineering of Hengsan Road (Xidong Road to Zihu Road) and Zihu Avenue (the south side of Hengsan Road to Nantouyong). The specific content includes road works, Construction preparation stage, construction stage, project completion stage (including but not limited to completion acceptance, rectification, project handover, project settlement, etc.) of water supply and drainage (rain and sewage) projects, bridges and culverts, lighting projects, greening projects, traffic projects, etc. The whole process of construction supervision services during the period of defect liability period. The successful bidder must also advance into the field according to the tenderer's request to participate in the preparation and planning of the above-mentioned project start-up work, and assist the tenderer in formulating corresponding project management measures.

PM Stepper Motor

Pm Stepper Motor,Square Flange Stepper Motor,High Precision Stepper Motor,Permanent Magnet Stepper Motor

Changzhou Sherry International Trading Co., Ltd. , https://www.sherry-motor.com

没有评论:

发表评论