2019年10月31日星期四

Gear pump maintenance

1, start: (1) Check all pipeline flanges before starting, the tightness of joints. (2) Disc drive coupling, no friction and collision sound. (3) The first start should be injected into the pump liquid. (4) should be fully open before inhalation and discharge of the valve in the pipeline, closed valve is strictly prohibited to start. (5) After verifying the direction of motor rotation, start the motor. 2, parking: (1) turn off the motor. (2) Close the pump inlet and outlet valves. (3) Check each valve is closed.

T Post/Y Post can be installed with the panels without clamps and bolts, with easier installation and wider application.

T Post specification:

type: America standard with plate, Europe standard without plate

size: 0.95lb/ft, 1.25lb/ft, 1.33lb/ft

length: 5'-8'

surface treatment: hot dip galvanized or paint green normal

Y post specification:

standard size: 30*30*3mm, 35*35*3.5mm

weight: 1.32kg/m, 1.46kg/m, 1.83kg/m, 1.98kg/m, 2.05kg/m, 2.45kg/m

height: 1000mm, 1200mm, 1500mm, 1750mm, 2000mm, 2200mm, 2400mm

Surface treatment: galvanized and paint coated common color: black

*Related Products:t post,y post,star picket.


T/Y Post

Galvanized T Post,Pp Y Plastic Post,Galvanized Y Post,T Post,Y Post

Anping Deming Metal Net Co.,Ltd , https://www.wovenfence.nl

没有评论:

发表评论